sample knit – march
| Began | March 25, 2014 |
| Finished | April 9, 2014 |
85% | |
| Edited | April 15, 2014 |
Rose City Yarn Crawl mystery knitalong. using my new Karbonz to try them out. color 1: 26g remain color 2: 23g remain
Prototype + JOMR striped knitalong (aug-sept), Yarniacs fingering knitalong (8/31). showing pics of only non design elements intentionally for now. need to weave ends still, 9/1.
made 2.
co 14 each side, JMCO. two at a time on two circs. increase up to 36 each side. increase on top of foot 2 times each end of needle twice, then 2 more times rapidly at the end of the foot length. knit to 7 3/8” long before heel. heel over 36st: 1-11-12-11-1.