Author: kristine

red witches socks
Finished | Knitting

red witches socks

CO 14st JMCO. July 28, 2016 Increased to 38st. September 6, 2016 44st on top gradually, 40 bottom (full set of increases, 2 top/2 bottom, at 6 1/4”) heel at 7 1/8” (instead of 7 1/4” because of 40st instead of 38). FLKH 1-13-12-13-1 October 27, 2017 increased twice on front of sock. total stitches…

summer vines tunic
Finished | Knitting

summer vines tunic

june top band color: 104g to start; 67g after band — 37g for band. 13 repeats, 3” each. June 22, 2016 cable adjustment for bodice – 4 st cable: 3st to back, k1; p2, k1 from cable needle. stretchier than the cable called for by the pattern, but takes less swapping of stitch orientation when…

MsZombie 2016
Finished | Knitting

MsZombie 2016

June socks due to counting issues, each heel ended up being knitted twice. not the same counting issues, but the 2 stitches that were different between them wasn’t enough to rip back further than the heels, it just interfered with my FLKH enough that they needed tweaking. started for my flight on #kdlbadventure. bound off…

omena may vest
Finished | Knitting

omena may vest

mixed weights – worsted, sport, sport-ish handspun. gauge on worsted was a touch tight, so went up in stitch count from the biggest size, and knit the back a little longer. rather than welts for the rows, knit in garter. added short rows surrounding the top of the vest to add more length without adding…