Queen K marble
started out during Lost, and moved along between other things today.
started out during Lost, and moved along between other things today.
Began | February 24, 2010 |
Finished | February 24, 2010 |
75% | |
Edited | February 25, 2010 |
Made for | sale |
Size made | medium |
Cast on 2 triangles at a time. Weekend of 2/19-2/22, started and finished striping section. Accidentally seamed up the wrong sections of the triangles to make one LARGE triangle instead of a paralellagram.
Started with a square double stranded in seed stitch. Picked up stitches all the way around and started a meshy stitch. Decreased and added a few stockingette rows and an eyelet row in case I wanted a drawstring half way up. More mesh and then handles at the top. Finished knitting 3/15, still need to…
Using my new Zephyr tips. Knitting is done, deciding on a fringe or no fringe.
for travel knitting, may 2011