blue tessug
Prototype + JOMR striped knitalong (aug-sept), Yarniacs fingering knitalong (8/31).
showing pics of only non design elements intentionally for now. need to weave ends still, 9/1.
Prototype + JOMR striped knitalong (aug-sept), Yarniacs fingering knitalong (8/31).
showing pics of only non design elements intentionally for now. need to weave ends still, 9/1.
| Began | August 22, 2012 |
| Finished | September 1, 2012 |
100% | |
| Edited | September 2, 2012 |
| Made for | prototype |
all yarn held double.
knitting a shorter short one to use up this small skein of handspun and participate in the Yarnings Podcast knitalong! started with about 19g, ended with 1g. wound the rest on my little niddy noddy, about 14yds left. did less repeats of each of the 4 motifs.
made two in this colorway.
i <3 hearts! swatched and casted on 2/15 for a sock project to work on during Madrona. The afterthought heel backfired on me, I put it too deep into the foot and they looked like clown socks, they were so long! Considered leaving them as tube socks, but decided to rip back the first heel…
Project Number Assigned: 5212 Cast on with ZKN Operation Sock Drawer day. Used less than two threads of beads.
I found some self-striping yarn in my stash to join in on the Stockinette Zombie’s self-striping knit along for 2022. Using yarn that had previously been a shawl that didn’t work great for me! And then, being me, I’ve been expanding the shawl to be bigger based on how much yarn I have left.