blue tessug
Prototype + JOMR striped knitalong (aug-sept), Yarniacs fingering knitalong (8/31).
showing pics of only non design elements intentionally for now. need to weave ends still, 9/1.
Prototype + JOMR striped knitalong (aug-sept), Yarniacs fingering knitalong (8/31).
showing pics of only non design elements intentionally for now. need to weave ends still, 9/1.
Began | August 22, 2012 |
Finished | September 1, 2012 |
100% | |
Edited | September 2, 2012 |
Made for | prototype |
I love this pattern and purchased tan, green, and plum colored yarn for it. Started mid-September. Update: Finished sock one on October 16th. Updated 2/08: I’m about 1/2 done with the second sock. HIBERNATING. I’m tired of these! My guage is looser than I’d like, the weaving of the yarn for the stripes takes more…
Project Number Assigned: 5212 Cast on with ZKN Operation Sock Drawer day. Used less than two threads of beads.
Got the multicolor skein from craig, bought the coordinating skein. Didn’t do the bind off exactly as written, wanted a little more ease.
march top; 2 colors alternating, then finish with spectrum? March 2, 2016 confusion over the right side and wrong side of the chart and I had to restart after 6 or 7 rows because the chart wasn’t making sense. restarted with written instructions – even rows are right side. cast on with German twisted cast-on…
Starting in Silver, then deep periwinkle blue, and finally a plum color. Guessing on the amt of yarn used.
began on the train to ZK. picked back up for the flight home. made it over half way on edging at the fort on the fourth. edging used backwards knitting technique.