fred8 design project
Began | January 20, 2015 |
Finished | Work in progress |
% | |
Edited | June 14, 2016 |
Plan: Toe-up socks, ankle length, toes and heels in grey. Started with the Risata using Judy’s magic cast-on. After about half of the increases, started striping the Felici to add more interest. Switched to all Felici after getting to the desired stitch count. Intend to do an afterthought heel with the same striping sequence. 4/10:…
queued April 5, 2010 Tweeted “finished the bind off on my citron, and I love it! will try and do pics tomorrow 🙂 8 tiers, around 1000 beads, in 12 days” 1/3: cast off complete! used the yarn-over cast off to allow plenty of room for the beads and to keep for a ruffly edge….
I love this pattern and purchased tan, green, and plum colored yarn for it. Started mid-September. Update: Finished sock one on October 16th. Updated 2/08: I’m about 1/2 done with the second sock. HIBERNATING. I’m tired of these! My guage is looser than I’d like, the weaving of the yarn for the stripes takes more…
for Sept/Oct Stockinette Zombies KAL and Whatcha Swatchin’s Fall KAL. n2n measurement: 36” gauge: ~5 st/in (just under) used Megan (justrunknit)’s spreadsheet to determine cast on (100), body (180), fronts (38), back (104). Striping two colors of Noro Yuzen. Steeks for armholes.
The total left between the 2 sets of orchid minis is 163g.
dream of the cosmos reminds me of katamari damacy 🙂