Ripple Bralette
need to weigh the remaining yarn, but must find my scale first!
need to weigh the remaining yarn, but must find my scale first!
| Began | September 2, 2019 |
| Finished | August 24, 2019 |
100% | |
| Edited | May 30, 2020 |
| Pattern URL | Ripple Bralette by 847816 |
see favs for f+f on top of foot. found out (after completing the heel) i had dropped a stitch in the foot! I had somewhere increased to compensate but the little stitch was hanging out waiting for me. I put a stitch marker through it and it was good for the rest of the knitting…
alternate names: bitcabeach, PB&J toe up zigzagular socks, just using the stitch pattern on my standard toe up socks. JMCO 12, increase to 38. slowly increase to 42 on outside edge of sole, moved 4 stitches from inner edge of sole to instep before starting heel. FLKH at 7 1/4”, 12-12-12. Knit 2” after heel…
ZK2021/ZKN KAL: Something new: Mosaic knitting and Knit Companion
I’ve always wanted to knit an intricate circular shawl, and this is the one I’ve watched other people knit (Carin from Round the Twist, Megan from Stockinette Zombies) that captured my attention. I have 1760 yards of Knit Picks Gloss Lace in Blackberry (4 skeins at 50g each of 440yards). It would be neat to…
Making for Christmas 2009. Instead of 3 solid colors, I’m using 2 solids and one multi, which adds a nice random touch. I need to learn to weave in ends as I go better, it took almost an hour of weaving for the first half, but there’s nice edges to weave them into so it…
june top band color: 104g to start; 67g after band — 37g for band. 13 repeats, 3” each. June 22, 2016 cable adjustment for bodice – 4 st cable: 3st to back, k1; p2, k1 from cable needle. stretchier than the cable called for by the pattern, but takes less swapping of stitch orientation when…