Knitting

coziboxi
Finished | Knitting

coziboxi

starting one more sweater before the end of the year! December 24, 2015 Cast on provisionally a row under the arm division. (next time, do several rows first, it would help with stability for the arm holes.) Work upward! December 30, 2015 finished fronts and back and 3 needle bind off. this took almost all…

pannekoeken socks!
Finished | Knitting

pannekoeken socks!

started these on the #alumholiday road trip. 10-11-2015 finished toe increases and knit on these during E’s reunion. 11-15-2015 knit through a busy weekend! 11-18-2015 at 5 1/2” of the foot. 12-02-2015 just before the heel, increased 2 stitches on the instep (same style increase as toe) to give it more room on top. 7…

motorway roadtrip
Finished | Knitting

motorway roadtrip

715g (3.6 skeins) of the bigger chunks of ripped BMFA STR Heavyweight. 10-08-2015 Cast on prior to #alumholiday road trip so it could be knit on during the drive. By the time we got going, I had the body memorized. 10-15-2015 end of #alumholiday and I have 6.5” of the 11” I have planned on…

toes in the sand
Finished | Knitting

toes in the sand

alternate names: bitcabeach, PB&J toe up zigzagular socks, just using the stitch pattern on my standard toe up socks. JMCO 12, increase to 38. slowly increase to 42 on outside edge of sole, moved 4 stitches from inner edge of sole to instep before starting heel. FLKH at 7 1/4”, 12-12-12. Knit 2” after heel…