April Shawl
Project Number Assigned: 5212
Cast on with ZKN Operation Sock Drawer day.
Used less than two threads of beads.
Project Number Assigned: 5212
Cast on with ZKN Operation Sock Drawer day.
Used less than two threads of beads.
Began | October 12, 2020 |
Finished | November 24, 2020 |
100% | |
Edited | November 30, 2020 |
Pattern URL | April Shawl by 314699 |
Made for | me |
ES in Hawthorne. design sample
Using some of the leftover yarn from the Stripey Steeky Blanket. Knit during baby shower and while Lisa was in labor to send my positive energy towards her. Plus, while waiting to meet her for the first time. They turned out kinda manta-ray-ish as I wasn’t paying full attention to the increases and decreases. Delivered…
i loved knitting with this hand spun but it ended up being too curled up instead of lying flat. ripped to make the shawl shrug.
A small clutch that needs lining and hardware still. Seed stitch edges with a slight cable. 2/24: The knitted fabric blocked wonderfully straight. Leslie provided some slightly modern fabric with the same green in it. May need a black cord for the top where the fabric meets the hardware. Finished lining and stitching up, July…