2016

red witches socks
Finished | Knitting

red witches socks

CO 14st JMCO. July 28, 2016 Increased to 38st. September 6, 2016 44st on top gradually, 40 bottom (full set of increases, 2 top/2 bottom, at 6 1/4”) heel at 7 1/8” (instead of 7 1/4” because of 40st instead of 38). FLKH 1-13-12-13-1 October 27, 2017 increased twice on front of sock. total stitches…

summer vines tunic
Finished | Knitting

summer vines tunic

june top band color: 104g to start; 67g after band — 37g for band. 13 repeats, 3” each. June 22, 2016 cable adjustment for bodice – 4 st cable: 3st to back, k1; p2, k1 from cable needle. stretchier than the cable called for by the pattern, but takes less swapping of stitch orientation when…