ES Hawthorne
ES in Hawthorne. design sample
Began | February 21, 2015 |
Finished | March 17, 2015 |
100% | |
Edited | March 23, 2015 |
Made for | design sample |
JMCO 12st 2 at a time, on longer bent circs; after increases, switched to 9” circs to zoom zoom concurrently. gauge is a bit tighter on these needles, ~10/in. increased to 38. increase mid foot and before heel to 42. knit to 7.25” before FLKH. 1-13-14-13-1 these ended up too long, gifted to Karen.
I wanted some basic slippers. Sarah admired my library slippers with the fuzzy top and the padding in the bottom, so I wanted those to be elements of these socks too. I did short row toes and heels similar to Knitty’s Twinkle toes and then added eyelets so a piece of yarn could be woven…
Cast on 2 triangles at a time. Weekend of 2/19-2/22, started and finished striping section. Accidentally seamed up the wrong sections of the triangles to make one LARGE triangle instead of a paralellagram.