Finished

Risen
Finished | Knitting

Risen

alternate skeins after neckband start. CO for 40”. Increase with Raglan to the 44” size. Decrease 2 times total, then knit 20 rows. Increases in triplets for a fuller shape. One purl row of main color, then start intarsia block of imagination (keeping the neckband the same on both ends using each skein on either…

red witches socks
Finished | Knitting

red witches socks

CO 14st JMCO. July 28, 2016 Increased to 38st. September 6, 2016 44st on top gradually, 40 bottom (full set of increases, 2 top/2 bottom, at 6 1/4”) heel at 7 1/8” (instead of 7 1/4” because of 40st instead of 38). FLKH 1-13-12-13-1 October 27, 2017 increased twice on front of sock. total stitches…

summer vines tunic
Finished | Knitting

summer vines tunic

june top band color: 104g to start; 67g after band — 37g for band. 13 repeats, 3” each. June 22, 2016 cable adjustment for bodice – 4 st cable: 3st to back, k1; p2, k1 from cable needle. stretchier than the cable called for by the pattern, but takes less swapping of stitch orientation when…